- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理签字语一览表
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 百富餐饮锁的扩张与管控.doc
- 百技通播软件安装使用说明.doc
- 百斯盾发策略分析.doc
- 瘦人增肌身计划攻略.doc
- 百汇嘉业媒总策划张铭峰另类解读影视作品与商战:《满城尽带黄金甲》与营销.doc
- 百货店经策略.doc
- 百货门店销手法对比研究分析.doc
- 百货店促手段分析比较.doc
- 百货招商明会暨品牌推介会方案.doc
- 百龙滩电防洪应急预案.doc
- 江煤集团(贵州公司)异地并购模式的战略抉择与实践探索.docx
- 通肺化痰汤治疗慢性阻塞性肺疾病急性加重期痰浊阻肺夹瘀证的疗效与机制探究.docx
- 社会发展代价论视域下转型期中国发展的辩证审视与路径探索.docx
- 英汉演讲语篇衔接手段的多维对比与解析.docx
- 三黄汤治疗溃疡性结肠炎:临床疗效与修复因子干预的深度剖析.docx
- 一类带耗散项和源项的非线性波动方程的定性分析与应用探究.docx
- 我国工伤认定标准的法律审视与完善路径探究.docx
- 市场环境动态下干散货船舶最优航速的多维度解析与策略构建.docx
- 输变电工程资产全寿命周期管理:理论、实践与创新.docx
- 中国创业资本系统制度的深度剖析与创新路径探究.docx
文档评论(0)