- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 社交礼仪论作业答案.doc
- 石油地质识要点.doc
- 社会主义治理论人才培养和队伍建设.doc
- 社交礼仪时作业和答案.doc
- 礼仪十讲末作业.doc
- 社会保障单选.doc
- 社会保障之不定项选择.doc
- 社会保障点汇总.doc
- 社会保障论复习资料.doc
- 碳纤维复材料在电动汽车车身中的应用分析.doc
- 中考地理真题练习 2024年四川省内江市中考地理真题(解析版).doc
- 中考地理真题练习 2024年河南省中考地理真题(原卷版).doc
- 中考地理真题练习 2024年四川省内江市中考地理真题(原卷版).doc
- 中考地理真题练习 2024年黑龙江省龙东地区中考地理真题(原卷版).doc
- 中考地理真题练习 2024年黑龙江省牡丹江市中考地理真题(原卷版).doc
- 中考地理真题练习 2024年甘肃省武威市临夏州中考地理真题(解析版).doc
- 中考地理真题练习 2024年甘肃省白银市中考地理真题(解析版).doc
- 中考地理真题练习 2024年湖南省中考地理真题(解析版).doc
- DB13_T2694-2018 地理标志产品 兴隆山楂.docx
- 内蒙古巴彦淖尔市2024-2025学年高一下学期期末考试生物含答案.doc
文档评论(0)