- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
级商英人培养方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 粉尘内场爆灯和防暴灯具价格.docx
- 粉末活性无尘自动投加设备.doc
- 粉末活性吸附技术处理源水臭味的应用研究.doc
- 粤东沿海江下游流域水文特性.doc
- 管系基本识普及 下.doc
- 精品好书怀孕手册》.doc
- 粉末活性投加设备.doc
- 精品彩宝础知识.doc
- 精彩搞笑机短信.doc
- 精心收集生活实用妙招【建议收藏备用】.doc
- 【语文】福建省南平市2025届高三第三次模拟考试试题(解析版).docx
- 【历史】2025届广东省汕头市高考二模试题(解析版).docx
- 【语文】湖北省宜荆荆恩四校2024-2025学年高三4月联考试题(解析版).docx
- DB21_T 4150-2025 水质 6种双酚类化合物的测定 固相萃取_高效液相色谱法_可搜索.pdf
- DB21_T 4151-2025 城镇污水处理厂提标改造技术规程_可搜索.pdf
- TCHSLA 10008-2023 风景园林工程能力评价规范.pdf
- TCHSLA 10008-2023 风景园林工程能力评价规范.docx
- DB21_T 4159-2025 青少年足球技能等级划分技术规范(男子U7—U12).docx
- DB21_T 4159-2025 青少年足球技能等级划分技术规范(男子U7—U12)_可搜索.pdf
- DB21_T 4150-2025 水质 6种双酚类化合物的测定 固相萃取_高效液相色谱法.docx
文档评论(0)