- 1、本文档共100页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 100
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mar
您可能关注的文档
- 精彩搞笑机短信.doc
- 精心收集生活实用妙招【建议收藏备用】.doc
- 管仲财税想的现代观点分析 pdf.doc
- 精明消费典保姆篇.doc
- 精明消费典物流货运篇.doc
- 精品布艺味包糖果手提袋.doc
- 精装修项管控.doc
- 精益研发关键在于愿不愿去做.doc
- 粉尘防爆光灯和防爆环形荧光灯价格.docx
- 精装酒店公寓营销策划.doc
- 2025年企业社工员工关怀项目可行性研究报告.docx
- 2025年广东省深圳市南山区教科院初三二模英语试题及答案.docx
- 预算编制与企业战略关联.pptx
- 2025口服抗衰消费者趋势洞察报告-最终版-库润数据&功能食品圈.pptx
- 七年级上册数学同步练习(人教版2024)612点、线、面、体(三大类型提分练)(试卷+解析).docx
- 2025年天津市生态农业示范园有机果蔬立体栽培模式可行性研究报告.docx
- 草根自媒体创业方案咨询.docx
- 【高二期末7.07】广东省汕头市2024-2025学年高二下学期教学质量监测数学试题答案.pdf
- 七年级上册数学同步练习(人教版2024)621直线、射线、线段(分层培优提分练40题)(试卷+解析).docx
- 测绘咨询服务方案.docx
文档评论(0)