- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
组织计划现象分析
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 红湾碧岛目营销推广方案.doc
- 红十字博周系列活动策划书浙江财经大学红十字会学生分会.doc
- 红外线遥逻辑分析仪.doc
- 系统动力模型.doc
- 红湾碧岛目营销方案.doc
- 红外报警控方案.doc
- 红烧扣肉ACCP计划书.doc
- 红色旅游命地汇总.doc
- 红色旅游源的开发价值评析.doc
- 纤维与纱概论doc.doc
- 2025年电商平台本地生活服务行业发展趋势预测报告.docx
- 疫苗行业研发创新与2025年重大疾病防控策略研究及案例分析报告.docx
- 户外运动装备租赁市场消费者行为分析与营销策略报告.docx
- 2025年工业机器人行业市场供需分析及预测研究报告.docx
- 2025社区智慧医疗远程手术协作人才培养策略报告.docx
- 沉浸式数字教育资源在初中物理实验课中的应用效果分析教学研究课题报告.docx
- 2025年废旧电子产品回收再利用行业政策影响评估报告.docx
- 2025年全球美容美发协作机器人市场潜力与行业应用研究报告.docx
- 高中英语教师批判性思维教学能力的提升路径.docx
- 工业机器人协作作业安全防护技术与实施路径2025年展望.docx
文档评论(0)