- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
经典婚礼仪主持词
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 精美简历板精心整理.doc
- 纳税基础实务任务二答案.doc
- 纳税服务础知识.docx
- 纳税实务案大中专均适用.doc
- 纳税基础实务模拟卷.doc
- 纵隔肿瘤治指南.doc
- 纸包装印新技术.doc
- 纳税筹划习.doc
- 纳税申报实操.doc
- 纳税申报关表证单书.doc
- 半导体材料性能提升技术突破与应用案例分析报告.docx
- 半导体设备国产化政策支持下的关键技术突破与应用前景报告.docx
- 剧本杀市场2025年区域扩张策略研究报告.docx
- 剧本杀行业2025人才培训体系构建中的市场需求与供给分析.docx
- 剧本杀行业2025年人才培训行业人才培养模式创新与探索.docx
- 剧本杀行业2025年内容创作人才需求报告.docx
- 剧本杀行业2025年区域市场区域剧本市场消费者满意度与市场竞争力研究报告.docx
- 剧本杀市场2025年区域竞争态势下的区域合作策略分析报告.docx
- 剧本杀行业2025人才培训与行业人才培养模式创新.docx
- 剧本杀行业剧本创作人才心理素质培养报告.docx
最近下载
- GB50150-2016 电气装置安装工程 电气设备交接试验标准 (2).pdf VIP
- GBT51121-2015 风力发电工程施工与验收规范.doc VIP
- 抗凝剂皮下注射技术临床实践指南(2024版)解读 2PPT课件.pptx VIP
- 腰椎解剖应用.ppt VIP
- 人教版高一数学上册《第一单元集合》同步练习题及答案.pdf VIP
- 紫外可见分光光度计招标文件.doc VIP
- 《Android-Jetpack开发-原理解析与应用实战》读书笔记思维导图.pptx VIP
- DB3706_T 74-2021 西洋梨生产技术规程.pdf
- 【精选】ICAO附件14.pdf
- JEP122G 半导体器件失效机理和模型.pdf VIP
文档评论(0)