- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 组织结构整方案精品.doc
- 组织行为 四套作业.doc
- 纳税与实作业.doc
- 组织结构设计总结.doc
- 组织架构位说明.doc
- 组织行为习提纲.doc
- 组成细胞分子.doc
- 组织行为单元练习.doc
- 组织行为word版本.doc
- 组织行为教案.doc
- 2025年成都市玩偶生产荧光涂鸦互动玩偶开发可行性研究报告.docx
- 2025年成都市海绵生产用于体育馆室外运动场地透水改造可行性研究报告.docx
- 2025年天津市体操鞋企业团建运动应用报告.docx
- 2025年上海市溶洞极限运动(速降)场地开发可行性研究报告.docx
- 2025年上海市涵洞工程施工技术应用可行性研究报告.docx
- 2025年上海市体育场馆设施扎带安全防护可行性研究报告.docx
- 2025年上海市牦牛育肥产业园区建设可行性研究报告.docx
- 2025年旅拍宠物陪伴拍摄项目可行性研究报告.docx
- 2025年上海市进口食品节庆主题快闪店可行性研究报告.docx
- 2025年上海市洗选厂尾矿综合利用产业化可行性研究报告.docx
最近下载
- GB15763.1-2009 建筑用安全玻璃 第1部分:防火玻璃 (2).pdf VIP
- DB5101T 217—2025成都市城市绿化养护技术规程.pdf
- 漫画解读--非煤露天矿山重大事故隐患判定标准.pdf
- 伤口、造口、失禁性皮炎理论考试试题与参考答案.docx VIP
- LNG气化站安装工程施工的方案.doc VIP
- 2023年8月26日全国事业单位联考A类《职业能力倾向测验》真题.pdf VIP
- 跨境电子商务英语 课件 柯可 Unit 1 Overview of Cross-Border E-Commerce、 Unit 2 Main Cross-Border E-Commerce Platforms.pptx
- 2024年辅警招聘《公安工作基本知识》培训考试题库 (附答案).docx VIP
- 低氧对肝脏脂质代谢影响研究.docx VIP
- GB T 34986-2017 产品加速试验方法.doc VIP
文档评论(0)