- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
统计学习论的原理与应用
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 组织行为习提纲.doc
- 组成细胞分子.doc
- 组织行为单元练习.doc
- 组织行为word版本.doc
- 组织行为教案.doc
- 组合车间构吊装方案.doc
- 组织行为期末复习指导.doc
- 组织行为平时作业.doc
- 组织行为的作业.doc
- 组织行为在线作业C.doc
- 实施指南《GB_T32070-2022 土方机械物体监测系统》实施指南.docx
- 实施指南《GB_T41522-2022 犬病病毒基因芯片检测方法》实施指南.docx
- 实施指南《GB_T4622.1-2022 缠绕式垫片》实施指南.docx
- 实施指南《GB_T4910 - 2022 镀锡圆铜线》实施指南.docx
- 实施指南《GB_T11132-2022液体石油产品烃类的测定荧光指示剂吸附法》实施指南.docx
- 实施指南《GB_T45633-2025人类唾液样本采集与处理》实施指南.docx
- 实施指南《GB_T20840.14-2022 直流电流互感器》实施指南.docx
- 新解读《GB_T 29635-2013疑似毒品中海洛因的气相色谱、气相色谱-质谱检验方法》最新解读.docx
- 实施指南《GB_T24353 - 2022 风险管理指南实施指南:全面提升风险管理效能》.docx
- 实施指南《GB_T26949.4-2022 工业车辆稳定性验证》实施指南.docx
文档评论(0)