- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
统计学原在线作业E
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 细胞生物复习提纲.doc
- 组织行为案例分析.doc
- 细胞生物实验论文.docx
- 细胞生物教学大纲.doc
- 组织行为讲义综合.doc
- 细胞生物报 综述格式.doc
- 细胞生物教程.doc
- 细胞癌变老凋亡.doc
- 细胞生物笔记细胞的内膜系统.doc
- 细胞生物翟中和第四版教案.doc
- 2025甘肃静宁县华煤集团招聘100人笔试历年参考题库附带答案详解.pdf
- 2025年艾梅乙培训考核试题(附答案).docx
- 2024年新疆特克斯县邮政公开招聘工作人员试题带答案详解.docx
- 2025年艾梅乙培训考试试卷(含答案).docx
- 2024年云南省镇雄县邮政公开招聘工作人员试题带答案详解.docx
- 2024年云南省镇沅彝族哈尼族拉祜族自治县邮政公开招聘工作人员试题带答案详解.docx
- 2024年新疆托克逊县邮政公开招聘工作人员试题带答案详解.docx
- 2025年安徽出租车从业资格证考试答题技巧.docx
- PICC置管后常见并发症和处理.ppt
- 2025河南洛阳某国有投资集团有限公司招聘10人笔试历年参考题库附带答案详解.pdf
最近下载
- 公司章程英文版 Company Articles of Association.doc VIP
- 英文版公司章程ARTICLES OF ASSOCIATION OF.docx VIP
- 从《倾城之恋》的白流苏透析张爱玲小说中的女性形象.docx
- 档案搬迁服务 投标方案.doc
- 日本 东要介--透析液纯净化.cn.pdf VIP
- mpr300电机保护器使用使用说明书.doc
- 2025年乡村振兴战略下县域经济产业链优化研究报告.docx VIP
- 胜利仪器VICTOR 240.240S.270.270S双通道系列示波器用户手册.pdf VIP
- 智能浇灌系统的策划书3篇.pdf VIP
- 新HSK3级词汇最新分析和总结.pdf VIP
文档评论(0)