- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
平顶山学院教学楼网络综合布线设计方案 111530142 李琦
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel pa
您可能关注的文档
- 网上申报载流程.doc
- 网上申报程.doc
- 网上记分业一.doc
- 网上零售利模式比较与分析.docx
- 网店推广销策略.doc
- 网上报税作流程及注意事项.doc
- 网店策划案淘宝.doc
- 网上转学程操作.doc
- 网易网聚的力量.doc
- 网控直流电源系统介绍.doc
- 2025年烟台市正大城市建设发展有限公司招聘工作人员12名笔试参考题库附带答案详解.doc
- 2025年衢州市属国企公开招聘工作人员笔试参考题库附带答案详解.doc
- 2025中铁四局集团有限公司法律合规部公开招聘1人笔试参考题库附带答案详解.docx
- 2025中国建筑股份有限公司岗位招聘【人力资源部(干部人事部)】笔试参考题库附带答案详解.docx
- 2025年滁州定远县中盐东兴盐化股份有限公司招聘2人笔试参考题库附带答案详解.doc
- DB1331T109-2025雄安新区建设工程抗震设防标准(963.84KB)(1).pdf
- 2025辽宁省能源控股集团所属抚矿集团招聘76人笔试参考题库附带答案详解.pdf
- 2024陕西延长石油集团华特新材料股份有限公司社会招聘8人笔试参考题库附带答案详解.pdf
- 2023内蒙古大唐国际锡林浩特矿业有限公司采煤自营专项社会招聘32人笔试参考题库附带答案详解.pdf
- 2024年12月云南大学国际合作与交流处公开招聘(1人)笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
最近下载
- 个体防护装备配备规范.pdf VIP
- 尾矿库安全规程.docx VIP
- 工作场所有害因素职业接触限值 第2部分物理有害因素.doc VIP
- DX—TH2使用与维护说明书附图.doc VIP
- 危险化学品单位应急救援物资配备要求.pdf VIP
- GB30000.26-2013 化学品分类和标签规范 第26部分:特异性靶器官毒性 反复接触.pdf VIP
- 2025《速度、力度与常用音乐术语》大单元整体教学设计.docx
- GB 30000.28-2013 化学品分类和标签规范 第28部分:对水生环境的危害.docx VIP
- GB30000.27-2013 化学品分类和标签规范 第27部分:吸入危害.pdf VIP
- GB30000.25-2013 化学品分类和标签规范 第25部分:特异性靶器官毒性 一次接触.pdf VIP
文档评论(0)