- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
脊柱结核疗指南
HYPERLINK / /
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by ser
您可能关注的文档
- 翻译常用语汇编.doc
- 翠园环境观设计理念与创意.doc
- 美食节活方案.docx
- 老爷岭数网技术协议.doc
- 老司机的驶经验.docx
- 继续教育员操作手册.doc
- 美术馆专之一.doc
- 老百姓开预算.doc
- 联想组织构分析.docx
- 联想液晶修手册.doc
- 厨房电器电商渠道拓展2025年行业痛点与解决方案报告.docx
- 2025年半导体设备研发策略:技术创新与路线选择指南.docx
- 跨境电商品牌国际化之路:2025年文化适配案例分析与市场拓展策略.docx
- 民宿品牌在乡村振兴中的传播效果评估与优化.docx
- 2025年二手交易平台信用评价系统在二手宠物市场的应用研究.docx
- 未来五年再生医学技术在关节移植领域的应用与发展.docx
- 2025年数据要素市场法律风险防范策略研究报告.docx
- 2025年母婴电商行业用户画像与选品策略研究.docx
- 2025年潮玩市场社群运营风险与应对策略报告.docx
- 虚拟主播在直播带货中的应用现状与消费者接受度调查报告(2025年).docx
文档评论(0)