- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
莲花办事目标责任书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 20
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 良性前列增生诊断治疗指南.doc
- 良好心理质下的基层合作小组建构.doc
- 色彩的冷暖 教案.doc
- 航空意外感知风险与购买意愿的关系研究终修改.doc
- 船舶领域划方案.docx
- 船舶电台号和电台执照网上申请指南.doc
- 色谱法分原理 教案.doc
- 艺术展演案.doc
- 艾滋病传途径阻断法.doc
- 艾滋病基知识与急性期所出现的常见症状.doc
- 2025-2026学年初中道德与法治八年级下册统编版(五四学制)(2024)教学设计合集.docx
- 2025年医疗大数据隐私保护技术在合规框架下的应用风险与应对报告.docx
- 2025年风力发电储能系统适应性分析报告.docx
- 医药流通企业供应链协同案例研究:2025年医药电商物流配送模式创新趋势分析.docx
- 基于2025年的城市新能源汽车共享充电跨境服务网络用户行为研究报告.docx
- 基于2025年的职业技能培训课程开发与平台建设可行性评估及市场调研报告.docx
- 基于2025年的跨境健身器材电商仓储配送效率提升研究报告.docx
- 基于2025年的老年康养社区智慧化服务产业链条构建分析.docx
- 2025年乡村文化旅游报告:文旅融合背景下的乡村旅游与乡村旅游与乡村旅游可持续发展.docx
- 深度剖析2025年数控机床智能化升级的技术创新与产业布局报告.docx
文档评论(0)