- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 20
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 营销学原随堂作业及答案.docx
- 薄片零件压机.docx
- 薪资设计过程中牵涉相当多的因素.doc
- 薪资外部配方法.docx
- 薪酬体系计基本程序.doc
- 薪酬概论点知识.doc
- 薪酬福利系设计方案.doc
- 藤野先生段分析.doc
- 蓟县西井村入选中国传统村落 探访古村现状.doc
- 虢镇茗苑排水监理实施细则毛卫东.doc
- 2025年非晶合晶变压器行业现状分析报告及未来五至十年发展前景预测报告.docx
- 2025年车用电子行业现状分析报告及未来五至十年发展前景预测报告.docx
- 2025年防辐射服行业现状分析报告及未来五至十年发展前景预测报告.docx
- 2025年坐具行业现状分析报告及未来五至十年发展前景预测报告.docx
- Unit 5The weather and us Part A Let's spell课件 2025人教pep英语四年级上册.ppt
- 动植物检疫复习题及参考答案.docx
- 2025年座便器行业现状分析报告及未来五至十年发展前景预测报告.docx
- 2025年传承文明礼仪之道班会.pptx
- 2025年车用窗帘行业现状分析报告及未来五至十年发展前景预测报告.docx
- Unit 5The weather and us Part A Let's talkLook and say课件 2025人教pep英语四年级上册.ppt
文档评论(0)