- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西和县森病虫害防治体系
西和县林业有害生物防治体系建设项目可行性研究报告 2009.3
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 20
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number
您可能关注的文档
- 蒙牛的最分析资料word.doc
- 薛峰水库砌石重力坝枢纽布置及消能防冲设计 副本.doc
- 蛋白质组复习总结.doc
- 蛋白质一复习学案.doc
- 薄板冲压型仿真软件.docx
- 融创中国购绿城内容.docx
- 蜗轮减速箱体设计说明书.doc
- 融资决策列教程之一·融资方式全面解析篇.doc
- 蛛网模型农产品数量与农产品价格之间关系的应用.doc
- 融资加权险值计算方法.doc
- 2025通信工程师考试考试彩蛋押题带答案详解(综合题).docx
- 2025通信工程师考试考试彩蛋押题附参考答案详解【B卷】.docx
- 2025通信工程师考试考试彩蛋押题带答案详解(培优B卷).docx
- 2025通信工程师考试考试彩蛋押题含答案详解(满分必刷).docx
- 2025通信工程师考试考试彩蛋押题含答案详解【黄金题型】.docx
- 2025通信工程师考试考试彩蛋押题含答案详解(巩固).docx
- 机器人辅助根治性膀胱切除.ppt
- 2025通信工程师考试考试彩蛋押题及答案详解(典优).docx
- 2025通信工程师考试考试彩蛋押题含完整答案详解(全国通用).docx
- 2025通信工程师考试考试彩蛋押题及参考答案详解(轻巧夺冠).docx
文档评论(0)