- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南财经学社团介绍
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 蒙牛的最分析资料word.doc
- 薛峰水库砌石重力坝枢纽布置及消能防冲设计 副本.doc
- 蛋白质组复习总结.doc
- 蛋白质一复习学案.doc
- 薄板冲压型仿真软件.docx
- 融创中国购绿城内容.docx
- 蜗轮减速箱体设计说明书.doc
- 融资决策列教程之一·融资方式全面解析篇.doc
- 蛛网模型农产品数量与农产品价格之间关系的应用.doc
- 融资加权险值计算方法.doc
- 2023年重庆市重庆市渝北区洛碛镇招聘社区工作者真题含答案详解.docx
- 2023年陕西省商洛市镇安县米粮镇招聘社区工作者真题及完整答案详解1套.docx
- 2023年重庆市彭水苗族土家族自治县彭水苗族土家族自治县梅子垭乡招聘社区工作者真题含答案详解.docx
- 2023年陕西省榆林市府谷县孤山镇招聘社区工作者真题及参考答案详解.docx
- 2023年重庆市重庆市涪陵区酒店乡招聘社区工作者真题含答案详解.docx
- 2023年重庆市重庆市南川区鱼泉乡招聘社区工作者真题及答案详解一套.docx
- 2023年重庆市重庆市北碚区天府镇招聘社区工作者真题附答案详解.docx
- 2023年重庆市重庆市永川区青峰镇招聘社区工作者真题附答案详解.docx
- 2023年重庆市彭水苗族土家族自治县彭水苗族土家族自治县太原乡招聘社区工作者真题带答案详解.docx
- 2023年重庆市重庆市江北区观音桥街道招聘社区工作者真题含答案详解.docx
文档评论(0)