- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西安地方色小吃业的发展研究
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 10
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 行政与行法大纲.doc
- 行政办公运转手册.doc
- 行政公文作复习.doc
- 行政学案汇总.doc
- 行政复议答案.doc
- 行政权力理目录.doc
- 行政权力行流程图.doc
- 螺旋式破机设计.doc
- 行政法与政诉讼法.doc
- 行政法与政诉讼法期末复习指导.doc
- 政策助力下的2025年建筑垃圾资源化商业模式创新模式探索.docx
- 城乡燃气管网提档升级项目环境影响报告书(范文模板).docx
- 2025年基础教育“双减”政策对中小学教学质量影响评估报告.docx
- 聚焦2025:老字号餐饮品牌数字化转型中的品牌形象与品牌故事研究报告.docx
- 2025年景区电动观光车5G智慧化改造项目实施方案及效益评估报告.docx
- 有机复合肥料项目筹资方案.docx
- 生物基包装材料在电商物流领域的应用现状与市场增长潜力.docx
- 传动链项目融资渠道探索.docx
- 商业地产项目2025年智慧城市背景下的定位与招商策略研究报告.docx
- 2025年储能行业成本下降对储能设备标准化的推动作用分析.docx
最近下载
- 《家庭路由器密码修改.doc VIP
- 光伏施工电站施工质量管理体系及保证措施.docx VIP
- 退换货应急服务措施及保障.docx VIP
- 医疗器械公司组织机构图和部门设置说明【模板范本】.docx
- 2020年最新小学数学教师编制考试新课标测试题及答案(三).docx VIP
- 拼多多法律顾问岗面试题库参考答案和答题要点.docx VIP
- 腾讯法律顾问岗面试题库参考答案和答题要点.docx VIP
- 小米法律顾问岗面试题库参考答案和答题要点.docx VIP
- 网易法律顾问岗面试题库参考答案和答题要点.docx VIP
- 惠普HP DeskJet Ink Advantage Ultra 4800 系列参考指南.pdf
文档评论(0)