- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 西方哲学慧答案.doc
- 西南科技学素质教育家庭理财答案.doc
- 西汉开通条丝绸之路.docx
- 西经宏观择判断.doc
- 西经史笔整理.doc
- 西方后现主义建筑艺术特征.docx
- 西安建筑技大学成果册.doc
- 西餐宴会台电子教案.doc
- 西餐的用礼仪.doc
- 西餐的认和西餐礼仪.doc
- 2025年中国标准双向干线放大器行业投资前景及策略咨询研究报告.docx
- 2025至2030年中国4-氯-2-硝基甲苯市场现状分析及前景预测报告.docx
- 2025至2030年中国中速智能型球摄像机市场现状分析及前景预测报告.docx
- 2025至2030年中国拆装并列式家具喷漆房市场现状分析及前景预测报告.docx
- 2025至2030年中国黑香炉市场现状分析及前景预测报告.docx
- 2025至2030年中国模内真空抽气系统市场现状分析及前景预测报告.docx
- 2025至2030年中国香根油市场现状分析及前景预测报告.docx
- 2025至2030年中国聚脲酯分级轮市场现状分析及前景预测报告.docx
- 2025年中国缝纫机线架行业市场调查、投资前景及策略咨询报告.docx
- 2025至2030年中国巴氏杀菌机配件市场现状分析及前景预测报告.docx
文档评论(0)