- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西餐的认和西餐礼仪
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 西安南越河通信技术车友俱乐部商业计划书.doc
- 西安周边驾游.doc
- 西安地方色小吃业的发展研究.doc
- 表格江苏筑给水排水.doc
- 西安市科计划项目申报指南.doc
- 西安市房产价格走势分析.doc
- 西安市铁中实习日志.doc
- 西安护城水质分析与生态修复方案doc.doc
- 西安市零行业发展现状.doc
- 西北地区市商圈.doc
- 2024年稀有金属冶金投资申请报告代可行性研究报告.docx
- 2024年放射性固体废物处置系列设备项目项目投资申请报告代可行性研究报告.docx
- 许昌县电梯安全管理人员考试考试资源库与答案.docx
- 细胞自噬作用研究-洞察及研究.docx
- 2024年汽车安全气囊及装置项目项目投资需求报告代可行性研究报告.docx
- 银行金融消费权益知识竞赛试题(附答案).docx
- 2025年储能技术在电网调峰调频中的应用现状与展望.docx
- 2024年头孢项目项目投资申请报告代可行性研究报告.docx
- 医疗信息化系统设计.pptx
- 《财产险理赔流程优化中的区块链技术与数据共享模式研究》教学研究课题报告.docx
最近下载
- 检测单位各部门岗位职能职责.doc VIP
- 2025内蒙古鄂尔多斯市公安机关招聘留置看护警务辅助人员115人笔试参考题库附答案解析.docx VIP
- 模电教案-李国丽.doc
- 2023版中国结直肠癌及癌前病变内镜诊治共识PPT课件.pptx VIP
- 证监会现场核查工作底稿-A股首次公开发行IPO保荐底稿.docx VIP
- UIC513-1994铁路车辆乘坐舒适性评估.pdf VIP
- 2025年医学课件-右心声学造影.pptx VIP
- 企业内部控制培训课件完整版(164页PPT).ppt VIP
- 2024年秋人教版七年级英语上册全册课件:Unit 7.pptx VIP
- Unit 6 A day in the life Section B (课件)-2024-2025学年人教版英语七年级上册.pptx VIP
文档评论(0)