- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
计量学基知识
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 14
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 计算机审本科教学大纲.doc
- 计算机二办公软件高级应用.doc
- 计算机基知识 Word 文档.doc
- 计算机应基础教程.doc
- 计算机基知识讲座.doc
- 计算机应技术论文变电站综合自动化系统建设关键技术.doc
- 计算机技基础.doc
- 计算机应技术基础.doc
- 计算机应技术专业人才培养方案.doc
- 计算机应基础知识点.doc
- (高清版)DB42∕T 2380-2025 《养老机构失智老年人生活自理能力训练》.docx
- (高清版)DB4403∕T 402-2023 《住宅物业服务规范》.docx
- (高清版)DB42∕T 2382-2025 《社区居家养老服务机构安全应急规范》.docx
- (高清版)DB4403∕T 422.3-2024 《诚信计量管理规范 第3部分:计量技术机构》.docx
- (高清版)DB4403∕T 439-2024 《公共数据安全评估方法》.docx
- (高清版)DB13∕T 6108-2025 《韭菜周年绿色生产技术规程》.docx
- (高清版)DB4403∕T 408.3-2023 《公交智能调度系统 第3部分:平台通信协议》.docx
- (高清版)DB4403∕T 512-2024 《公共厕所管理规范》.docx
- (高清版)DB4403∕T 461-2024 《科研机构商业秘密保护管理规范》.docx
- (高清版)DB54∕T 0482-2025 《高海拔地区10kV 油浸式配电变压器选型技术规范》.docx
文档评论(0)