- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
论债权人位权的构成和效力
文章来源:中顾法律网
上网找律师 就到中顾法律网 快速专业解决您的法律问题
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color
您可能关注的文档
- 计算机毕设计开发实例.doc
- 计算机组原理概念.doc
- 计算机科与技术专业学术型硕士研究生培养方案.doc
- 计算机网和硬件知识竞赛.doc
- 计算机网word版.doc
- 计算机组原理网络知识整理.doc
- 计算机科与技术专业级本科人才培养方案.doc
- 计算机级础知识.doc
- 计算机网技术人员标准.doc
- 计算机网基本知识.doc
- 职业教育产教融合共同体构建中的校企合作项目绩效评估报告.docx
- 2025年编程教育平台师资培训与人才引进策略研究报告.docx
- 影视行业2025年工业化制作流程质量控制与影视技术进步报告.docx
- 2025防汛防台安全预案.doc
- 2025年工业催化燃烧技术环保效益评估报告.docx
- 2025年中药新药研发:现代化路径与市场战略布局研究报告.docx
- 农产品溯源体系建设与农产品质量安全追溯信息平台建设2025年研究报告.docx
- 2025年健身器材电商仓储配送仓储空间利用优化报告.docx
- 2025年元宇宙与文物修复技术的融合创新研究报告.docx
- 餐饮企业成本控制与供应链整合优化策略研究报告.docx
文档评论(0)