- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
财产保险同责任的认定与处理
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 论海上货运输中承运人的识别二稿.doc
- 论消费者含义和范围.doc
- 论新媒体代我国报业的经营发展.doc
- 论消费者益保护法的不足与其完善.doc
- 论特许经在我国的发展前景及面临的挑战.doc
- 论推销环对推销的影响.doc
- 论破产中未履行完毕的合同.doc
- 论文要求指导老师.doc
- 论网络营与传统营销信息传播方式.doc
- 论电商与统商业异同.doc
- 中国行业标准 DB/T 100-2024区域性地震安全性评价.pdf
- 《GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架》.pdf
- GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- DB/T 100-2024区域性地震安全性评价.pdf
- 中国行业标准 GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- 校园周边书店阅读氛围对初中生阅读素养提升的影响研究教学研究课题报告.docx
- 初中校园餐饮卫生监管与食品安全教育创新模式研究教学研究课题报告.docx
- 《文化遗产保护与旅游开发平衡机制的法律法规完善研究》教学研究课题报告.docx
- 《农作物病虫害生物防治技术的经济效益与社会影响分析》教学研究课题报告.docx
- 1 剖宫产术后子宫瘢痕憩室治疗中的并发症预防与护理措施教学研究课题报告.docx
文档评论(0)