- 1、本文档共52页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
超临界直锅炉说明书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 48
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 资产评估则无形资产.doc
- 资产评估卷打印.doc
- 贫民窟的万富翁.doc
- 资产评估器设备.doc
- 资产损失前扣除政策辅导材料附件二.doc
- 资产运用率分析.doc
- 资料员实总结.doc
- 购物中心户服务.doc
- 资料员一通.doc
- 资源性产价格调整的波及效应分析.docx
- 分析stat8019分析分配.pdf
- 星期三早上physics hl paper 3 tz2物理纸3TZ2.pdf
- 资料课件文案.pdf
- 护理职业风险及防范(第2版):常用护理职业防护技术PPT教学课件.pptx
- 大学生综合素养—奋斗,我们在路上:我们与生俱来的自愈力PPT教学课件.pptx
- 大学生综合素养—奋斗,我们在路上:舌尖上的战斗本职PPT教学课件.pptx
- 护理职业风险及防范(第2版):护理职业风险与医疗卫生法律法规PPT教学课件.pptx
- 大学美育:优雅的旋律-艺术之美PPT教学课件.pptx
- 普通话与职业口才训练教程(第2版):教师口语训练PPT教学课件.pptx
- 护理职业风险及防范(第2版):生物性职业危害与防护PPT教学课件.pptx
最近下载
- 长螺旋钻孔压灌混凝土旋喷扩孔桩施工方案.doc VIP
- 肺康复ppt优质课件.pptx VIP
- GB-50352-2019-民用建筑设计统一标准.pdf VIP
- 建设工程施工合同示范文本gf-2013-0201)协议书、通用条款、专用条款.docx VIP
- 高考语文阅读理解《鸭子》含答案.docx VIP
- 无菌检查用培养基灭菌后的保存有效期的验证方法.docx VIP
- 输变电工程标准工艺(变电工程电气分册)2022版.docx VIP
- 2025贵州省专业技术人员继续教育公需科目考试题库(2025公需课课程).docx VIP
- 抹灰砂浆规范.docx VIP
- 模具工劳动合同协议书.docx VIP
文档评论(0)