- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
资产评估卷打印
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 谈谈房地开发项目前期策划合同的订立发展与协调.doc
- 谈谈房地开发项目前期策划合同的订立研究与分析.doc
- 谈道德品修养在大学成才过程中的重要性.doc
- 豪宅客户究概念篇图表.doc
- 谢桥选煤新建压滤车间.doc
- 贝克汉姆护肤秘籍”独家曝光.docx
- 财产与责保险.doc
- 谈大学生业的自我营销策略.doc
- 财产保险例及分析.doc
- 语音网关话机部分.doc
- 2025年上海市教育评估院公开招聘笔试高频难、易错点备考题库及参考答案详解1套.docx
- 2025年《分级护理制度》考试试题(及答案).docx
- 注册会计师考试讲义_会计_零基础预习专题四 逐章考点预热(1).docx
- 2025年《公共基础知识》试题库(附答案).docx
- 2025年上海市教育评估院公开招聘笔试备考题库及答案详解1套.docx
- 2025年上海市教育评估院公开招聘笔试备考题库及答案详解一套.docx
- 注册会计师考试 财务管理 33_普通股资本成本的估计(1)(笔记版).docx
- 注册会计师考试 财务管理 33_普通股资本成本的估计(1)(阅读版).docx
- 2025年上海市文化和旅游事业发展中心招聘笔试备考题库及答案详解1套.docx
- 2025年上海市文化和旅游事业发展中心招聘笔试备考题库及完整答案详解1套.docx
文档评论(0)