- 1、本文档共29页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
谈道德品修养在大学成才过程中的重要性
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 论文必备英文献数据库大全.doc
- 论文发表格式.doc
- 论文大纲构模板.doc
- 论文浅谈何提高惠州市民的保险意识.doc
- 论文:我草地退化的研究和可持续发展.doc
- 计算机局网络.docx
- 论文:电废水重金属和COD全面达标处理新技术.doc
- 论水资源家所有权的法律性质.doc
- 论海上货运输中承运人的识别二稿.doc
- 论消费者含义和范围.doc
- 艺术品数字化交易平台的个性化推荐系统设计与实现报告.docx
- 《小学数学教师教学画像构建与教学风格演变规律实证研究热点与前沿分析》教学研究课题报告.docx
- 高中午餐满意度调查:营养餐供应与青少年饮食健康促进策略与实践研究教学研究课题报告.docx
- 有色金属行业2025年资源循环利用产业链上下游企业合作模式研究报告.docx
- 文化娱乐行业消费者行为与市场细分:2025年消费升级路径报告.docx
- 农村金融服务体系创新与农村金融业务拓展模式评价——2025年报告.docx
- 提升生产效率:2025年工业机器人在柔性制造系统中的应用与系统集成分析报告.docx
- 2025年工业互联网平台数据备份与恢复策略:数据备份与恢复风险管理.docx
- 2025年双减政策下K1课外辅导行业政策影响下的市场机遇与挑战分析报告.docx
- 2025年食品行业食品安全追溯体系在食品安全追溯产业服务模式创新中的应用报告.docx
最近下载
- 沿着塞纳河到翡冷翠.pdf VIP
- 2025甘肃定西市招聘专业化管理村党组织书记103人考试备考试题及答案解析.docx VIP
- 一种小鼠结直肠原位癌模型的构建方法.pdf VIP
- 百度地图-北京市购物中心报告-71页.pdf VIP
- 克莱斯勒-Grand Voyager-产品使用说明书-Grand Voyager(3.6L)-Grand Voyager(3.6L)-2013款大捷龙用户手册(产品使用说明书).pdf
- 居住绿地设计标准.pdf VIP
- 新媒体短视频代运营.pptx VIP
- 人教版(2025)八年级英语上册 Unit 1 Happy Holiday单元检测卷(含答案及听力原文,无听力音频).doc VIP
- 2025人教版英语四年级上册Unit 4 Helping in the community单元测试试卷.docx VIP
- 企业短视频代运营.pptx VIP
文档评论(0)