- 1、本文档共28页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
郑大一附研究生招收目录
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 迪安肿瘤体化治疗.doc
- 远程网络频监控系统.doc
- 连续梁桥计计算.doc
- 逆变电源品说明书.doc
- 透视“培和“训”.doc
- 透视日本族的长寿秘诀.doc
- 通信网路协议.doc
- 通信新技第二次作业.doc
- 通信技术业人才培养方案.doc
- 通信基站阳能供电方案.doc
- 云南体育运动职业技术学院《食用菌生物学》2023-2024学年第一学期期末试卷.doc
- 吉林省东辽五中2024届高考冲刺模拟英语试题含解析.doc
- 武昌首义学院《第二外语2(韩语)》2023-2024学年第一学期期末试卷.doc
- 高血压患者的护理与治疗.pptx
- 深圳技术大学《现代工程图学》2023-2024学年第一学期期末试卷.doc
- 江西省宜春三中2024年高考全国统考预测密卷历史试卷含解析.doc
- 兰州现代职业学院《统计预测与决策(双语)》2023-2024学年第一学期期末试卷.doc
- 2025年山东泰安市高三第五次月考英语试题文试题含解析.doc
- 西安高新科技职业学院《工程制图实验课》2023-2024学年第二学期期末试卷.doc
- 2025年北京市海淀区人大附中高三下学期3月月考历史试题文试题含解析.doc
文档评论(0)