- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
采购部经助理
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 邮政营销经验介绍.doc
- 郑州市科计划项目申请指南.doc
- 郑州美食新最全汇总.doc
- 部分国内防雷及相关标准.doc
- 部门核心争力操作方案.doc
- 郑州期货易所上市品种介绍.doc
- 郑大一附研究生招收目录.doc
- 部门经理键业绩指标KPI集成表.doc
- 郭炳亮+销型网站的建设与分析毕业论文.doc
- 郴州华塘租房技术标.doc
- 2025年网络文学平台版权运营模式创新与版权保护体系构建.docx
- 数字藏品市场运营策略洞察:2025年市场风险与应对策略分析.docx
- 全球新能源汽车产业政策法规与市场前景白皮书.docx
- 工业互联网平台安全标准制定:安全防护与合规性监管策略.docx
- 剧本杀剧本创作审核标准2025年优化与行业自律.docx
- 2025年新能源电动巡逻车在城市安防中的应用对城市环境的影响分析.docx
- 全渠道零售案例精选:2025年行业创新实践报告.docx
- 2025年网约车司乘纠纷处理机制优化与行业可持续发展报告.docx
- 2025年宠物烘焙食品市场法规政策解读:合规经营与风险规避.docx
- 2025年宠物行业数据安全监管政策影响分析报告.docx
文档评论(0)