- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Akypxeaa初级经济师金融专业知识与实务练习题
更多经济师考试资料及网络辅导课程请登录:
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolera
您可能关注的文档
- Aechzwt中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- aknfvea中山大学微观经济学与管理学原理考研试题答案.doc
- ajdpdk会计毕业论文现行经济环境下会计计量模式的探讨.doc
- ajozgmb中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- Aecgrrk中国经济管理大学学员课件某企业生产部组织机构图与岗位职责描述.doc
- ajovtxa中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- a工业设备及管道绝热工程质量的检验评定标准.doc
- Bkagiek经济师人力资源管理专业知识与实务考试大纲.doc
- bd通信信息业务员初级试卷正文.doc
- Coauhug经济管理论文:人力资源薪酬管理.doc
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【易错题】.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【精选题】.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【历年真题】.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【历年真题】.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【全优】.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解(全优).docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷及答案详解(全国通用).docx
- T∕CACM 1021.224-2018 中药材商品规格等级 白矾.docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解(精选题).docx
- 考点解析-鲁教版(五四制)8年级数学下册试卷含完整答案详解【各地真题】.docx
文档评论(0)