- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
上半经济形势分析及全展望
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- Duxmtp初级会计职称考试经济法模拟试题及答案.doc
- CPA考试经济法考点解读第章票据与支付结算法律制度1.doc
- Djkwca中级经济师考试工商管理专业知识学习讲义第四章.doc
- erclule政治经济学作业集必做题答案.doc
- ethenqg中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- EViews计量经济学实验论文凯恩斯消费理论的实证分析分析我国人均居民消费的影响因素分析修改.doc
- CPA考试经济法考点解读第章票据与支付结算法律制度3.doc
- etitmso中国经济管理大学战略人力资源管理学学员授课用书电子辅导资料.doc
- CPMCSAP物流信息化条码操作手册采购收货流程Ver.doc
- Fdajqnn沈阳农业大学农学专业农业推广实习报告.doc
- 《听障儿童言语康复训练中的家庭与学校协同教育策略研究》教学研究课题报告.docx
- 《校园网络SDN控制器安全机制研究》教学研究课题报告.docx
- 小学数学课:叶菜类水培系统产量与空间布局关系研究教学研究课题报告.docx
- 数字化教学管理改革中的学校组织文化建设与教育质量评价改革研究教学研究课题报告.docx
- 生成式人工智能在小学美术教学反思中的应用研究教学研究课题报告.docx
- 《生态建筑自然采光与通风一体化设计在建筑生态灾害防控工程中的应用》教学研究课题报告.docx
- 小学科学教育数字资源设计中的学生参与式教学模式探讨教学研究课题报告.docx
- 小学图书馆个性化服务在美术教育中的应用与实践教学研究课题报告.docx
- 高中生物实验校园植物生态修复与环境保护记录研究教学研究课题报告.docx
- 高中生心理健康讲座对学生心理压力调节能力的影响教学研究课题报告.docx
文档评论(0)