- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级会计职称考试中级经济法知识点:第七章企业所得税法律制度
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm
您可能关注的文档
- LCA工业制冷恒温风冷式冷水机和DYJA风冷式冷水机价格.docx
- Uclmri经济师考试中级人力资源管理备考练习试题.doc
- TGX型FTTX用多媒体信息箱完成稿.doc
- Uetfxy经济师考试人力资源管理专业知识与实务讲义一.doc
- SDTGA工业分析仪说明书.doc
- SH培训资料系统信息及诊断原理和应用.doc
- Tzvfnm经济师人力资源管理专业知识与实务考试大纲.doc
- oeoe经济基础知识四考试含答案.doc
- usrmye厦门大学管理学与管理经济学及答案考研试题.doc
- Xwgsyc最实用的经济管理资源共享集免费下载.doc
- 2024-2025学年度医师定期考核每日一练试卷附完整答案详解【全优】.docx
- 2024-2025学年度医师定期考核每日一练试卷带答案详解(夺分金卷).docx
- 2024-2025学年度医师定期考核每日一练试卷附参考答案详解(突破训练).docx
- 2024-2025学年度医师定期考核每日一练试卷带答案详解(基础题).docx
- 2024-2025学年度医师定期考核每日一练试卷附参考答案详解【夺分金卷】.docx
- 2024-2025学年度医师定期考核每日一练试卷完整答案详解.docx
- 2024-2025学年度医师定期考核每日一练试卷(典优)附答案详解.docx
- 2024-2025学年度医师定期考核每日一练试卷带答案详解(黄金题型).docx
- 2024-2025学年度医师定期考核每日一练试卷带答案详解(实用).docx
- 2024-2025学年度医师定期考核每日一练试卷含答案详解【培优】.docx
最近下载
- H3C Workspace云桌面 客户端定制配置指导(办公场景)-5W104.pdf
- 小学班队活动设计方案.pptx VIP
- 国开电大 道路工程 形考任务1-4答案.pdf VIP
- 小学班队工作原理与实践教案.doc VIP
- 701-第七章-小学班队活动管理.pptx VIP
- 2025年混凝土质量控制及管理制度(二篇) .pdf VIP
- 在线网课学堂《领导学:领导力成长路线图》单元测试考核答案.pdf
- GB 44022-2024硝酸铵安全技术规范解读.pptx VIP
- 在线网课学习课堂《人工智能与生物特征识别(北理 )》单元测试考核答案.pdf VIP
- Unit 5 Is this your pen (说课稿)-2024-2025学年湘少版(三起)(2024)英语三年级上册.docx VIP
文档评论(0)