- 1、本文档共33页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试财政税收专业知识与实务终极冲刺卷
考中级经济师到鸭题库YaTiK做精准试题,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre st
您可能关注的文档
最近下载
- 2024年安徽省初中学业水平考试中考数学试卷(真题+答案).docx VIP
- 习概期末考复习测试附答案.docx
- GB 25194_杂物电梯制造与安装安全规范.pdf VIP
- 开放系统11846《商法》期末机考真题及答案(第110套).docx VIP
- 2025届苏州中考一模英语试卷及答案 .pdf VIP
- 2025年人教版七年级下册数学期中复习专题01 相交线与平行线(考题猜想,11种易错重难点与解题模型73题专项训练)原卷版.docx VIP
- 社区工作者考试300题附完整答案【各地真题】.docx VIP
- 七年级美术教案(人教版)全册.doc
- 2025青海省从优秀村(社区)党组织书记中考录乡镇公务员32人笔试备考试题及答案解析.docx VIP
- 欧盟新法规MDR培训.pptx VIP
文档评论(0)