- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
优化方案高考地理新一轮复习达标训练:第章第讲工业的区位选择
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
最近下载
- 【大学课件】电子商务案例分析.ppt VIP
- DL∕T 793.2-2017 发电设备可靠性评价规程 第2部分:燃煤机组.pdf
- 一种多酚类化合物和组合物及其在制备具有抗衰老作用的产品中的应用.pdf VIP
- 一种TA@LS-Ag复合物及其在制备具有抗衰老作用的护肤品、化妆品或药物中的应用.pdf VIP
- Walkera华科尔无人机FCS-F8使用指南_CN_V1.2_2020.10.12(金属壳版).pdf
- 老年人居家适老化改造工程竣工验收单(参考模板)(2022年参考新格式).docx
- 人教版(2024)七年级英语上册Unit 7 Happy Birthday Lesson 1课件+音频(共20张PPT).ppt.pptx VIP
- 中试平台管理制度.docx
- 北京市清华附小2023年四年级数学第二学期期末监测模拟试题含解析.doc
- 《化妆品配方与制备技术》课件——第7章 造型用品.pptx VIP
文档评论(0)