- 1、本文档共31页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
信息工程出租车计价器设计
PAGE 28
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the correspondingPAGE 28
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which sha
您可能关注的文档
最近下载
- 征信报告模板-带水印-通用.docx VIP
- 女儿墙维修工程施工方案(3篇).docx VIP
- 找准下一个买卖点.docx VIP
- 2026届高一物理必修一同步1.4 速度变化快慢的描述——加速度(解析版).docx VIP
- UniStrong合众思壮eSurvey2.0软件使用说明书.pdf VIP
- 中国宏桥首次覆盖报告:高景气与一体化与高分红,电解铝龙头静待价值重估.docx VIP
- 中国宏桥-市场前景及投资研究报告:高景气+一体化+高分红,电解铝龙头,价值重估.pdf VIP
- 少女漫画·女作家·日本人-中外文学作品丛书.docx VIP
- 人教版四年级数学上册期末测试卷核心考点.pdf VIP
- 爆破工程技术人员取证培训初级D设计题真题参考答案.pdf VIP
文档评论(0)