- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
信息技术考试复习资料
2011年信息技术中考复习资料
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviatio
您可能关注的文档
最近下载
- 全面预算管理操作实施手册汇总.pdf VIP
- 空调安装质量保证措施和创优计划.docx VIP
- 2025陕西延长石油(集团)有限责任公司招聘(1881人)笔试备考题库及参考答案详解一套.docx VIP
- 汉字的“六书”理论.ppt VIP
- 高考语文作文的命题趋势研究.pptx VIP
- Rexroth力士乐电动缸EMC说明书.pdf VIP
- 2008年修电脑1400张照片连接.docx VIP
- 2023年重庆小升初一三八巴蜀育才巴川入学考试宝典及语文、数学试题.doc VIP
- 2025年5月新高考语文全国Ⅰ卷各地模考试题汇编之古代诗歌鉴赏.docx VIP
- 吹瓶机安全操作规程培训.pptx VIP
文档评论(0)