- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础模拟答案
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 二级建造工程师考试网上辅导建设工程施工管理施工信息管理.doc
- 云南初中信息技术五大模块复习资料:总结计划汇报设计可编辑.doc
- 云南农业大学学报社科版论文模板.doc
- 中级职称中级经济法试题及详解.doc
- 产业经济学必修教学大纲戴.doc
- 人事厅培训项目投资估算和经济效益讲课稿.doc
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- DB23_T 3866-2024冰上龙舟赛事组织服务规范.docx
- DB32 2163-2012 棉纱单位可比综合电耗限额及计算方法.docx
- DB32∕T 2429-2013 棉花田间生长发育观察记载规范.docx
- DB23_T 3820-2024 工业互联网综合平台数据质量管理规范.docx
- DB23_T 3474-2023非煤智慧矿山信息系统技术规范.docx
- DB3201_T 1106-2022 工程地质层划分技术规范.docx
- DB33T 2515-2022公共机构“零碳”管理与评价规范.docx
- DB3301_T 0415-2023 装修垃圾收运处置管理规范.docx
- DB3311/T 106―2019“丽水山居”民宿服务要求与评价规范.docx
- DB3201T 1127-2022 慈善捐赠受赠管理规范.docx
最近下载
- 亿赛通电子文档安全管理系统V5.0--客户端使用手册V1113379.pdf VIP
- [标准规范]煤矿窄轨铁道维修质量标准及检查评级办法(精编).doc VIP
- 人教统编版小升初语文总复习专题七:句式变换课件(共28张PPT).ppt VIP
- 2025重庆永川区板桥镇村(社区) 后备干部选拔笔试备考试题及答案解析.docx VIP
- 深度解析《GBT 44026-2024预制舱式锂离子电池储能系统技术规范》.pptx
- 品质部各岗位职责说明书.pdf VIP
- 2022.01 深圳南山红花岭工业区城市更新项目一期建筑方案设计 华艺.pdf VIP
- 电冰箱安全技术规程培训.pptx VIP
- 07FK02 防空地下室 通风设备安装.pdf VIP
- 解决我国农民负担问题的路线图设想-中国发展.pdf
文档评论(0)