- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称考试经济法基础试题及答案8
PAGE 16 / NUMPAGES 17 大家网 TopS
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes and大家学习网 HYPERLINK 更多精品在大家!
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work re
您可能关注的文档
最近下载
- 人教PEP版小学英语五年级 下册(1-6单元)思维导图.pdf
- 国际金融附微课杜玉兰习题答案.docx VIP
- 2023年大连大学计算机科学与技术专业《计算机系统结构》科目期末试卷A(有答案).docx VIP
- 2023年大连大学计算机科学与技术专业《计算机网络》科目期末试卷B(有答案).docx VIP
- 知识产权法智慧树知到期末考试答案章节答案2024年同济大学.docx VIP
- 临床医学教学模式创新与课堂互动设计.pptx
- 生猪屠宰兽医卫生检验人员理论考试题库资料及答案.pdf VIP
- 天津市静海区2024-2025学年高一下学期6月学生学业能力调研试题 地理试卷含答案.docx VIP
- 有限空间安全作业技术交底.docx VIP
- 消防设施操作员(中级监控方向)理论知识考试题库(含答案解析).pdf VIP
文档评论(0)