- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计资格经济法全真模拟试题四答案及解析
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 会计专业技术资格考试经济法基础全真模拟试题六.doc
- 会计专业技术资格考试经济法基础全真模拟试题二.doc
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础知识点第三章支付结算法律制度本章考情分析.docx
- 优化方案高考地理新一轮复习达标训练:第章第讲工业的区位选择.doc
- 会计专业技术资格考试经济法基础模拟试题四笔试专用.doc
- 会计专业技术资格考试经济法基础全真模拟题三.doc
- 会计从业会计基础第十章主要经济业务事项账务处理.doc
- 会计专业技术资格考试经济法基础全真模拟题五.doc
- 会计考试经济法基础应试指南模拟题部分+1.docx
- 企业安全生产标准化信息管理系统用户操作手册企业端.doc
- 文化产业金融支持政策2025年实施效果评估与融资渠道优化策略研究报告.docx
- 2025年化工园区安全环保提升项目社会稳定风险评估与风险预警报告.docx
- 基于大数据的2025年物流仓储库存周转效率研究报告.docx
- 2024-2025学年度河北省单招考试一类 《文化素质数学》通关考试题库【重点】附答案详解.docx
- 公共卫生应急能力提升资金申请2025年政策环境分析报告.docx
- 2025年冷链物流食品温控技术与冷链物流企业物流网络优化策略报告.docx
- 深度解读2025年模具行业数字化设计仿真技术在非金属冲孔模具制造行业应用报告.docx
- 航空食品工业化生产过程中的食品安全与品质控制策略.docx
- 航空食品工业化生产设备更新与改造建议报告.docx
- 聚焦2025年:房地产市场成交数据归因分析报告——房地产市场与乡村振兴战略.docx
最近下载
- 成都电子科技大学实验中学新初一均衡分班语文试卷.doc VIP
- 成都电子科技大学实验中学新初一分班数学试卷含答案.doc
- 固体废物热值测定实验.doc VIP
- 14J936变形缝建筑构造.pptx VIP
- ZrO2-III 液晶显示氧化锆氧量分析仪说明书.pdf VIP
- 轻松学中医系列——《药性赋》选讲-曾培杰.docx
- Schneider Electric施耐德EvoPacT™ HVX 12kV真空断路器 全新一代数字化中压配电产品 操作手册安装和用户指南(中文).pdf
- 数控车削加工技术课程思政教学改革实践案例.docx VIP
- KORG科音Pa700快速说明书.pdf
- 2025年6月浙江省杭州市高一地理学考模拟试卷 1 .pdf VIP
文档评论(0)