- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计资格考试辅导经济法基础模拟试题三
和润会计把经验分享给有梦想的人
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: c
您可能关注的文档
- 会计专业技术资格考试应试指导及全真模拟测试经济法基础知识点第三章支付结算法律制度本章考情分析.docx
- 优化方案高考地理新一轮复习达标训练:第章第讲工业的区位选择.doc
- 会计专业技术资格考试经济法基础模拟试题四笔试专用.doc
- 会计专业技术资格考试经济法基础全真模拟题三.doc
- 会计从业会计基础第十章主要经济业务事项账务处理.doc
- 会计专业技术资格考试经济法基础全真模拟题五.doc
- 会计考试经济法基础应试指南模拟题部分+1.docx
- 企业安全生产标准化信息管理系统用户操作手册企业端.doc
- 会计信息失真治理论文审计监督论文会计内部控制毕业论文略论会计信息失真的治理对策.doc
- 会计信息系统至章.doc
最近下载
- 管理学案例两面针公司.ppt VIP
- Roland罗兰GW-8说明书 中文.pdf VIP
- 亚吉铁路运营现状及问题分析.pdf VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试参考题库附答案解析.docx VIP
- 大理州旅游美宿基本要求与评价.pdf VIP
- 2025年国开电大机考网考题库04008_理工英语4.doc VIP
- 中建EPC项目总承包管理方法与实务2024.docx
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试模拟试题及答案解析.docx VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试备考题库附答案解析.docx VIP
- 2025年铁路列车员(中级)职业技能鉴定参考试题库-下(判断题汇总).docx VIP
文档评论(0)