- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
南开大学经济学院第一学期计量经济学期末开卷试题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 6
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing
您可能关注的文档
- 信息检索与利用试题本科.doc
- 信息管理与信息系统专业培养方案修改后.doc
- 信息系统管理工程师知识点总结.doc
- 信息安全管理与评估省赛规程初稿v.doc
- 信息资源建设与组织期考整理.doc
- 全员人口个案管理信息系统基础数据结构与分类代码试行.doc
- 免费南农信息技术基础习题册答案.doc
- 全国一级建造师执业资格考试建设工程经济试卷后附真题考题答案.doc
- 全国一级建造师执业资格考试建设工程经济试卷后附试题答案.doc
- 全国一级建造师执业资格考试模拟试卷建设工程经济.doc
- 2024年湖北省荆州市公安县毛家港镇招聘社区工作者真题及参考答案详解.docx
- 2024年湖北省荆门市沙洋县沙洋劳动教养管理所招聘社区工作者真题及答案详解一套.docx
- 2024年湖北省荆州市石首市高基庙镇招聘社区工作者真题及完整答案详解1套.docx
- 2024年湖北省武汉市江夏区经济开发区藏龙岛招聘社区工作者真题及参考答案详解1套.docx
- 2024年湖北省荆门市京山县永隆镇招聘社区工作者真题及答案详解1套.docx
- 2024年湖北省武汉市江夏区金水农场招聘社区工作者真题含答案详解.docx
- 2024年湖北省荆门市沙洋县沙洋镇招聘社区工作者真题及参考答案详解一套.docx
- 2024年湖北省鄂州市鄂城区碧石镇招聘社区工作者真题附答案详解.docx
- 2024年湖北省武汉市蔡甸区大集街道招聘社区工作者真题及答案详解1套.docx
- 2024年湖北省省直辖行政单位潜江市西大垸管理区招聘社区工作者真题及答案详解一套.docx
文档评论(0)