- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
复旦大学经济学综合基础考研真题及详解1
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2
您可能关注的文档
最近下载
- 人教版初中生物会考试卷及答案.pdf VIP
- 2023年海南师范大学软件工程专业《数据结构与算法》科目期末试卷B(有答案).docx VIP
- 2023年四川省广元市中考地理试题卷(含答案详解).docx
- 2023年海南师范大学软件工程专业《数据结构与算法》科目期末试卷A(有答案).docx VIP
- 广西师范大学2020-2021学年《认知心理学》期末考试试卷(B卷)含参考答案.docx
- 羊常见疾病防治.ppt VIP
- 国开期末考试3987《Web开发基础》机考试题及答案(李老师第5套).pdf VIP
- 2024年怀化市靖州苗族侗族自治县六年级下学期小升初真题精选语文试卷含答案.doc VIP
- 2023年海南师范大学软件工程专业《计算机网络》科目期末试卷B(有答案).docx VIP
- 2025年社区工作者招聘考试题库及答案解析.docx VIP
文档评论(0)