- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
开学大礼包届高考政治一轮复习精品学案必修专题经济全球化与对外开放教师版
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE - 24 -
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x i
您可能关注的文档
- 地籍管理复习叶公强主编,中国农业出版社.doc
- 土地、房地产市场信息.doc
- 基于智慧现代化的现代物流升级与转型以攀枝花为例企业经济,.doc
- 复旦大学经济学综合基础考研资料重难点解析真题.doc
- 复旦大学经济学综合基础考研真题及详解.doc
- 复旦大学经济学综合基础金融考研大纲、参考书目、历真题、考研辅导.doc
- 复旦大学复旦世界经济考研真题及答案解析.doc
- 复旦大学经济学综合基础考研真题及详解2.doc
- 外贸易对中国经济发展中的作用.doc
- 国际经济法大纲copy.doc
- 人教版八年级上册数学精品教学课件 第十三章 三角形 章末整合练.ppt
- 人教版八年级上册数学精品教学课件 第十五章 轴对称 15.3 等腰三角形-15.3.1 等腰三角形-第2课时 等腰三角形的判定 (4).ppt
- 人教版八年级上册数学精品教学课件 极速提分法 第17招 整体思想在解题中的七种技巧.ppt
- 人教版八年级上册数学精品教学课件 第十五章 分式 专项突破9 分式方程的解在求字母的值或取值范围中的常用技巧.ppt
- 人教版八年级上册数学精品教学课件 第十八章 分式 18.3 分式的加法与减法-第1课时 分式的加减.ppt
- 人教版八年级上册数学精品教学课件 第十四章 全等三角形 14.1 全等三角形及其性质 (4).ppt
- 七年级作文成长的经历(11篇).docx
- 法律责任豁免声明及工作证明函(6篇).docx
- 叙事作文那是一次难忘的尝试750字通用14篇.docx
- 沙滩里的秘密500字(14篇).docx
文档评论(0)