- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
曼昆经济学原理微观经济学分册第版笔记第章应用:国际贸易
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2
您可能关注的文档
- 工业控制计算机原理及应用课程标准.doc
- 工业生产安全生产检查标准.doc
- 工业用衡器和jxh数字传感器接线盒价格.docx
- 工业用压缩空气冷干机、吸干机的工作原理及设备.doc
- 工业模具设计与制造模拟题.doc
- 工业集团招商公司策划体系工作指引请审批.doc
- 工业通风与除尘课程设计指导书新.doc
- 工业过滤器klkldzzv和供应滤油车价格.docx
- 工程经济模拟试卷六1.doc
- 工程经济考试考点与重点.doc
- 2025陕西汉中市镇巴县人民政府行政执法协调监督局选聘行政执法社会监督员笔试备考试题带答案详解(完整.docx
- 2025最新辅警招聘考试试题库附答案详解(综合题).docx
- 2025年陕西省辅警招聘考试考试试题库及答案详解(各地真题).docx
- 2025陕西汉中市镇巴县人民政府行政执法协调监督局选聘行政执法社会监督员笔试备考试题含答案详解(能力.docx
- 2025陕西汉中市镇巴县人民政府行政执法协调监督局选聘行政执法社会监督员笔试备考试题及答案详解(精选.docx
- 雅安市市交通运输综合行政执法支队热线员招聘笔试模拟试题附答案详解(a卷).docx
- 乐山市交通运输综合行政执法支队2025年度公开考核招聘交通运输综合行政执法辅助人员(3人)笔试备考题.docx
- 2025陕西汉中市镇巴县人民政府行政执法协调监督局选聘行政执法社会监督员笔试备考试题及答案详解1套.docx
- 乐山市交通运输综合行政执法支队2025年度公开考核招聘交通运输综合行政执法辅助人员(3人)笔试备考题.docx
- 2025青海玉树州行政执法机构招聘10人笔试备考试题含答案详解(实用).docx
文档评论(0)