- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程经济模拟试卷六1
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before th
您可能关注的文档
- 含答案经济生活第三单元检测题.doc
- 吴树青政治经济学资本主义部分笔记导论.doc
- 吴树青政治经济学资本主义部分笔记第章商品生产和商品流通.doc
- 后开发区时代经济功能区转型升级问题研究以北京汽车城投资管理有限公司为例.doc
- 吴树青政治经济学资本主义部分笔记第章垄断资本主义世界体系中的发达与不发达.doc
- 吉林大学经济学政治经济学、西方经济学考研真题及详解1.doc
- 吴树青政治经济学资本主义部分笔记第章资本主义土地所有权与地租.doc
- 吴树青政治经济学资本主义部分课后习题详解第章生息资本和利息.doc
- 吴树青政治经济学资本主义部分课后习题详解第章商品生产和商品流通.doc
- 吉林大学经济学考研真题及详解.doc
最近下载
- 体例格式7:工学一体化课程《windows服务器基础配置与局域网组建》任务3学习任务教学活动策划表.docx VIP
- G7718-2025与GB 7718-2011标准对比表格.xlsx VIP
- 地质勘探行业野外作业安全手册.doc VIP
- 2025年新高考全国Ⅰ卷英语模拟试卷(含答案).pdf VIP
- 浅谈施工企业“二次经营”管理.docx VIP
- 南宁市沙江河环境综合整治工程环评报告.pdf VIP
- 铁路桥隧工高级工操作技能试题库.pdf VIP
- 股骨干骨折的中医护理常规.ppt
- GB7718征求意见稿与GB 7718-2011对比表.xlsx VIP
- 低压电气设备安全知识.ppt VIP
文档评论(0)