- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吴树青政治经济学资本主义部分笔记第章资本主义土地所有权与地租
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 全球与中国工业激光市场统计分析.doc
- 全国会计考试经济法基础命题趋势预测及应试技巧.docx
- 公共经济学期末考试指导.doc
- 公需科目:低碳经济与可持续发展考试试卷.doc
- 共太原市委关于制定国民经济和社会发展第十二个五规划的建议.doc
- 全国高考地理分类汇编专题农业.doc
- 关于城乡经济社会发展一体化的认识讲稿.doc
- 全国计算机等级考试三级信息管理笔试真题.doc
- 全国经济专业技术资格考试试卷工商管理专业知识与实务中级.doc
- 公需科目低碳经济模拟考试题模似题.doc
- 吴树青政治经济学资本主义部分课后习题详解第章生息资本和利息.doc
- 吴树青政治经济学资本主义部分课后习题详解第章商品生产和商品流通.doc
- 吉林大学经济学考研真题及详解.doc
- 吴树青政治经济学资本主义部分笔记第章职能资本与平均利润.doc
- 咨询工程师宏观经济政策与发展规划真题及答案.doc
- 吴树青政治经济学资本主义部分课后习题详解第章资本主义土地所有权与地租.doc
- 吴树青政治经济学资本主义部分课后习题详解第章国家垄断资本主义.doc
- 哈尔滨航空工业集团有限公司.doc
- 吴树青政治经济学资本主义部分课后习题详解第章资本的积累过程.doc
- 吴树青政治经济学资本主义部分笔记第章垄断资本主义的形成和发展.doc
文档评论(0)