- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
吴树青政治经济学资本主义部分笔记第章商品生产和商品流通
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 全国高等教育自学考试计量经济学试题1.doc
- 全国经济专业技术资格考试金融专业知识与实务试卷初级.doc
- 全国经济专业技术资格考试试卷财政税收专业知识与实务中级.doc
- 全国计量经济学高等教育自学考试试题与答案.doc
- 全国计算机等级考试三级信息管理笔试真题1.doc
- 全国高等教育自学考试计量经济学试题历试卷.doc
- 全国高等教育自学考试计量经济学试题2.doc
- 全校信息检索实验指导书张炎.doc
- 全球工业机器人市场四大家族竞争分析.doc
- 全国艾滋病检测实验室信息管理系统操作手册业务部分.doc
- 山西省晋城市陵川县事业单位考试《公共基础知识》试题.docx
- 辽宁公务员考试行测试题及答案.docx
- 高二课件物理(人教版2019)选择性必修2第三章31交变电流.pptx
- 数轴课件人教版数学七年级上册_1.pptx
- 等式性质与不等式性质(第一课时课件)-高一数学《知识素养思维》精讲课件(人教A版2019).pptx
- -2常见统计图的识别及应用课件-高一下学期数学人教A版.pptx
- 部编版语文二下-5雷锋叔叔你在哪里第1课时.pptx
- 切线长定理课件北师大版九年级数学下册.pptx
- 2019人教版高中英语挖掘文本深度学习必修一Unit2(学生版).docx
- Unit8SectionAGrammarFocus课件人教版(级下册.pptx
文档评论(0)