- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
西南财经大学金融学院研究生导师信息介绍张桥云
凯程考研,为学员服务,为学生引路!
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM,
您可能关注的文档
最近下载
- 2024年安徽省合肥市庐阳区小升初数学试卷附答案解析.doc VIP
- 2025年陕西铜川市事业单位招聘带编入伍高校毕业生3人笔试模拟试题及参考答案详解一套.docx VIP
- 事业单位宣传工作总结PPT.pptx VIP
- TCCIAT_0003-2019_建筑施工承插型轮扣式模板支架安全技术规程.doc VIP
- 超声波探伤培训教材.doc VIP
- 2024年苏州昆山国创投资集团有限公司招聘考试真题 .pdf VIP
- 合并工作底稿完整版带公式.xls VIP
- 2025江苏苏州昆山国创投资集团有限公司第一期招聘17人考试备考题库及答案解析.docx VIP
- 家具设计软件:SketchUp二次开发_(6).动态组件设计与应用.docx VIP
- 2025江苏苏州昆山国创投资集团有限公司第一期招聘17人笔试模拟试题及答案解析.docx VIP
文档评论(0)