- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
zsfy高级财务管理综合练习题
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. 6.4.4.4 lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. 6.4.4.5 high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. 6.4.4.3 blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the tech
您可能关注的文档
最近下载
- 医院信息网络安全培训PPT课件.pptx
- 2025年前列腺科普试题及答案.docx
- 立式叶片排渣过滤机-中国化工设备网.doc
- 20250508 北京大学DeepSeek系列06:DeepSeek私有化部署和一体机.pptx VIP
- 【7上英YL】芜湖市2024-2025学年七年级上学期期中考试英语试卷.pdf VIP
- 屋面瓦及檩条拆除安全方案.doc
- Schneider Electric施耐德Easy Altivar ATV610 变频器编程手册(中文).pdf VIP
- NB∕T34024-2024生物质成型燃料质量要求及分级.docx VIP
- STM32F1开发标准教程-教学大纲、授课计划.docx
- 新语境幼儿园教师专业能力等级与评定.pdf VIP
文档评论(0)