- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
东莞虎门会计培训生产企业出口退税系统操作手册
HYPERLINK 会计知识
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tol
您可能关注的文档
- 逄锦聚政治经济学第版课后习题详解第三章货币与货币流通.doc
- 邢台市英才辅导初三历史一轮专题训练战后美国经济发展c.doc
- 逄锦聚政治经济学第版课后习题详解第十八章社会注意宏观经济运行.doc
- 郭峻岭基于web人才招聘信息管理系统前期报告.doc
- 邵东县教育信息化三行动方案.doc
- 重庆经济发展展望与预测.doc
- 金融经济学导论第章讲义.doc
- 金融经济学试题.doc
- 金融经济学复习题.doc
- 逄锦聚政治经济学第版课后习题详解第十六章社会主义市场经济与经济体制.doc
- DB37_T 5106-2018 装配式混凝土结构现场检测技术标准(OCR).pdf
- DB37_T 5172-2020 钢筋混凝土综合管廊工程施工质量验收标准(OCR).pdf
- 高考总复习优化设计二轮用书数学 专题突破练8 三角函数的图象与性质.pptx
- DB37_T 4384-2021 混凝土桥梁有效预应力无损检测技术规程(OCR).pdf
- DB35_T 1433-2019 石油化工装置防雷检测技术规范(OCR).pdf
- DB13(J)63-2011 河北省居住建筑节能设计标准(OCR).pdf
- 高考总复习优化设计二轮用书数学 专题突破练22 直线与圆锥曲线的位置关系.pptx
- DB37_T 2366-2022 《回弹法检测混凝土抗压强度技术规程》(OCR).pdf
- 高考总复习优化设计二轮用书数学 第1讲 计数原理.pptx
- DB37_T 2367-2022 《回弹法检测砌筑砂浆抗压强度技术规程》(OCR).pdf
最近下载
- Q∕GDW 11316-2018 高压电缆线路试验规程.pdf
- 《2022年加拿大妇产科医师协会“未足月胎膜早破的诊断与管理”指南》解读.pptx VIP
- T&E 2015.07.11 楼板温度应力分析(一) F.pdf VIP
- 贵广IV标隧道质量缺陷整治专项方案.doc VIP
- 《补肾调经汤治疗肾虚痰瘀型多囊卵巢综合征的临床观察》.docx VIP
- 私人借条正规版本.doc VIP
- 网球课程思政教学大纲-贾晓强(1).doc VIP
- 建筑和装修工程质量保证书范文.docx VIP
- 2024中级会计职称考试中级会计实务课件讲义——第二十一章 企业合并与合并财务报表.pdf VIP
- 领克-领克01-产品使用说明书-领克01 纯Lite-JL6453D03-8889793128CX11-LG国Ⅵ用户手册2.pdf VIP
文档评论(0)