- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
会计职称中级财务管理提升练习题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 中级会计师考试实务多选练习题含答案考试大论坛精品资料doc.doc
- 中级会计职称中级财务管理试题及答案.doc
- 中级会计职称考试一次过三门复习计划.doc
- 中级会计师模拟试题及答案y.doc
- 中级会计职称考试1.doc
- 中级会计师中级财务管理全真模拟试题中大网校.doc
- 中级会计师财务管理试题及答案.doc
- 中级会计职称各科目考试真题.doc
- 中级会计职称考试中级财务管理标准预测试题中大网校.doc
- 中级会计职称考试中级财务管理考试大纲.doc
- 贵州贵州省建设投资集团有限公司招聘考试真题附答案详解(研优卷).docx
- 河南南阳师范学院2021年招聘25名硕士研究生冲刺卷一(附答案与详解)及答案详解(名校卷).docx
- 陕西延长石油 (集团) 有限责任公司 所属单位招聘笔试题库及答案详解(必刷).docx
- 贵州民航产业集团有限公司招聘笔试题库含答案详解(基础题).docx
- 广汉市2025年公开招聘社区专职工作者(125人)考试备考题库含答案详解(考试直接用).docx
- 邢台市水务发展集团有限公司招聘真题附答案详解(实用).docx
- 新华保险总部人力资源部(党委组织部)招聘笔试题库含答案详解(预热题).docx
- 贵州苔茶产业发展集团有限公司招聘笔试题库含答案详解(b卷).docx
- 广汉市2025年公开招聘社区专职工作者(125人)考试备考题库附答案详解(综合题).docx
- 贵州城乡产业发展集团有限公司招聘笔试题库附答案详解(实用).docx
文档评论(0)