- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国税务系统企业所得税业务知识模拟考试试题及详解一
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes andPAGE 42
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the qu
您可能关注的文档
最近下载
- 中考英语三轮冲刺挑战满分练习01 阅读选择一:人与自我(中考真题精选)(含解析).doc VIP
- JB391585《液压机安全技术条件》.pdf
- Starter Unit 1 Hello! (Section A )分层作业同步卷(含答案)2024版.docx VIP
- 第16课 早期殖民掠夺(核心素养精品课件).pptx VIP
- 农村土地承包经营权调查规程.doc VIP
- T-CAGHP 020-2018地质灾害治理工程施工组织设计规范(试行).docx VIP
- 2024年版食品安全监督抽检实施细则理论考试试题及答案 .pdf VIP
- 龙门吊安装与拆除专项施工方案.doc VIP
- T_CHIA 54.1-2025 颈椎病专病电子病历标准数据集 第 1 部分:入院记录.docx VIP
- 05g359-3单轨吊_标准图集.pdf VIP
文档评论(0)