输配电策略
输配电线路策略
PAGE14 / NUMPAGES14
GUIDELINES TRANSMISSION LINE POLICY
2015
GUIDELINES
TRANSMISSION LINE POLICY
TRANSMISSION PACKAGE
1. A transmission package will comprise Extra High Voltage Over Head Lines (EHV OHL), the associated Grid Stations (GS) /Convertor Stations (CS) plant and equipment, and where required interbus power transformers, shunt reactors, metering, protection systems, SCADA, electro-communication equipment/facilities and any other required equipment and or systems. The OHL will include a specified optical fiber shield wire and associated equipment.
2. The Private Sector investor shall transfer a fully functional system at expiry of TSA term. For the purposes of Transmission Line Policy, EHV is defined to mean 220 kV and above AC and DC Transmission Lines.
PERFORMANCE STANDARDS
3. The OM of Transmission Line and GS/CS will be performed according to International standards/norms.
4. The PPIB Board has been made responsible for deciding responsibility structure for operation, routine and periodic maintenance for specific projects keeping in view their complexity and risk.
5. Cost of repair / insurance resulting from terrorism will not be attributed to the ITC, any cost of such repair/rehabilitation will be allowed as pass through cost in the tariff by NEPRA. The provincial/local governments will strengthen the surveillance and monitoring of the area.
LAND ACQUISITION
6. Land acquisition and acquisition of the legal right of way will be the responsibility of NTDCL. The area of land strips will be considered for calculating the length of the project.
7. Any necessary amendment in the relevant law will be moved by NTDCL through MOWP for efficient and fast-track acquisition of land.
8. Preferably the whole strip including the land for towers erection, Grid/converter station and wire conductors should be acquired. However, the matter would be decided and included in the RFP for each specific project.
9. In view of urgent requirement of new T